Marshfield Conservation Commission closes hearings on ADU, Water Street projects
Marshfield Conservation Commission unanimously approves ADU project near North River wetlands, issues two orders of conditions.
Conservation · Meeting of March 4, 2026
Marshfield Conservation Commission unanimously approves ADU project near North River wetlands, issues two orders of conditions. The commission closed public hearings Wednesday on a proposed 36-by-24-foot accessory dwelling unit at 180 Sawyer's Lane and a separate landscaping project at 13 Water Street, both brought by engineer Rick Cervant of Senbeck and Taylor. Conservation Administrator Mike Steele recommended a dual erosion control barrier, a staked silt sock over a toed-in siltation fence, for the sloped rear yard at Sawyer's Lane, where the structure sits just over 90 feet from a bordering vegetated wetland draining to the North River Basin.
The commission added a condition requiring all ADU roof drainage to be routed to a subsurface dry well after abutter Colin West, of 190 Sawyer's Lane, raised concerns about an existing erosion hole that has grown larger over the years on his down-gradient lot. The board also extended the Christmas Cove subdivision permit on Highland Street by three years under the Massachusetts LEADS Act and retained a 30-day herbicide notification requirement before any Sonar treatments at Fairways Edge Pond.
In the full story:
- The complete report, 1,053 words
Source: the Conservation meeting of March 4, 2026, reported from the official video recording and transcript.
Members read the rest of this story and every Marshfield meeting we cover, in full.
Become a memberAlready a member? Sign inA 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms
Share this story
Know someone in Marshfield who follows town government? Share Townbrief Marshfield: they can sign up free.